Inaugurated around November 2001, the treatment capacity of the treatment plant had become very low, making its operation hard. Because of this PLC-driven approach, the processing capacity increases from 8 m³ everyday to 40 m³ in practically 12 hours.. Lime is included in the compressed sludge to render it inert. "The system works continually, automatically, "
explains Jean-François Starck. The water agency offered 78, 500 in grants, protected General Council contributed 46, 400. As a result, the construction on the new facility was considered, which could have generated significant costs. She falls directly in to a trailer that will take her to somewhat of a storage area, before being made use of as fertilizer on farmland.
The answer was to optimize the wastewater healing cycle. A polymer is added plus Filter Presses Suppliersthey pass through a filter hit. Wastewater, one time decanted, becomes sludge. However, the company had committed throughout 1996 to cease discharges at sea adjusted December 31, 2015, an initiative then confirmed by a prefectural prohibition order in those days. The residual water is pushed towards periphery of the press, ahead of returning to settling. Figures that leave a fantastic margin for connecting new clients.
The company Alteo, the manufacturer of alumina, will finally have the ability to reject its residual liquid effluents off the national park of Calanques: the prefect of Bouches-du-Rhône signed in Monday, December 28 a decree providing a derogation for six years to the industrialist. The total amount of the particular works was 280 000 ahead of tax. The union contracted a mortgage of 100, 000, the balance being self-financing